Contact

MY-Fab Deliver Turnkey Offsite Construction Projects

We specialise in high precision manufacturing and development of offsite construction solutions for the built environment. Our team has developed a bespoke steel-framed volumetric system which allows for incredibly flexible design integration. While most other modular systems are designed with repetitiveness in mind, at MY-Fab we aimed for a product that will be able to fully fulfil our clients designs and wishes. There are very few companies capable of producing full volumetric structural modules in the UK.

Why MY-Fab

Our main product, a volumetric steel based module, achieves passivhaus level energy efficiencies allowing for a drastic reduction in in-use energy consumption and designed with consideration of cradle to cradle principles.

Coming from a building background we offer a full construction service, eliminating complex supply chains and de-risking the full development process. We will take you from design to delivery.

From initial project design to practical completion, we deliver the full project in-house with all elements of the modules and wider system are designed, manufactured and installed in-house by the MY-Fab team.

MY made its name in the prime plus market where quality and attention to detail is key. We have now brought that same attitude into the offsite construction sector. As a group, we’ve been building since 2005 and have completed over 250 projects across residential, commercial, education and health sectors.

Our systems were developed to suit homes or structures of up to 15 stories and can offer outstanding design flexibility.

MY-Fab’s systems utilise tried and tested construction methodologies, using current tools and systems to adapt them to offsite manufacturing.

We have reduced the costs associated with project managing significant developments including defects and reduce the need for multiple site visits.

Sustainability is at the heart of everything we do. We understand how we build matters as much as what we build. By driving down energy consumption and waste from our construction process, our operations and processes will be carbon net zero by 2025. Please see our Carbon Reduction Plan for further information.

Our Projects

See all projects
Feltham
Multi Unit Residential

The construction of a new co-living building is underway, with a unique approach to sustainability and environmental responsibility. Using modular construction, the building will consist of 128 separate apartments, each ...

Learn more
Sailmakers
Schools

Sailmakers is our flagship project for our new off-site fabrication facility – MY-Fab. Boasting 282 student accommodation units and 9 residential flats, over twenty thousand square feet in office space ...

Learn more
The Cut
Prime Residential

Currently on-site, one of MYC Group’s own developments, the Cut is a new-build residential development located at a busy intersection in Southwark. Opposite the Old Vic theatre, the site was ...

Learn more
Tribe Hotel
Hotels

The new TRIBE hotel at Manchester airport is a unique and innovative construction project that combines traditional construction methods with modern methods of construction (MMC) and offsite solutions. This hybrid ...

Learn more